Reports

Get the results of TWRI-funded research through technical and special reports. Find abstracts and full-text online for our reports.

SR-2005-01

Validating the Estimated Cost of Saving Water Through Infrastructure Rehabilitation in the Texas Lower Rio Grande Valley (Hidalgo County Irrigation District No. 1)

Ronald D. Lacewell, M. Edward Rister, Allen W. Sturdivant

A Case Study Using Actual Construction Costs for the Curry Main Pipeline Project, Hidalgo County Irrigation District No. 1 (Edinburg)

Back to Top